Sunday, April 1, 2012

first_vi:
  • timeline of events that ensued the 2009 quake
  • mappings of area to show spawning of wet markets
  • reasons why construction has been held back
  • intention, strategy, style
  • material list from photo analysis

detail drawings (section, axonometric) for:
  • typical debris wall with in-built drainage system, slot for roof
  • ablution pool/ washing area with tarpaulin lining and filtered pipe system

diagrams:
  • measurement system for debris function (exploded perspective)
  • size/ massing for total debris amounted from buildings
  • size/ massing for size of debris on site in cube form
  • size/ massing for size of debris in separate mounds
  • permutations/ arrangements for different types of business owners

storyboard panels for:
  • growth of temporary market, beginning from the ablution/ washing pool
  • construction of monument mounds - structure, pour in 
just - thinking aloud. and i'm not apologetic.

No comments:

Post a Comment