first_vi:
- timeline of events that ensued the 2009 quake
- mappings of area to show spawning of wet markets
- reasons why construction has been held back
- intention, strategy, style
- material list from photo analysis
detail drawings (section, axonometric) for:
- typical debris wall with in-built drainage system, slot for roof
- ablution pool/ washing area with tarpaulin lining and filtered pipe system
diagrams:
- measurement system for debris function (exploded perspective)
- size/ massing for total debris amounted from buildings
- size/ massing for size of debris on site in cube form
- size/ massing for size of debris in separate mounds
- permutations/ arrangements for different types of business owners
storyboard panels for:
- growth of temporary market, beginning from the ablution/ washing pool
- construction of monument mounds - structure, pour in
just - thinking aloud. and i'm not apologetic.
No comments:
Post a Comment